Call Caley: 0141 5567275

Contract Details:

Contract Value:

£ 173,639.11

Contract Duration:

16 Weeks March – June 2015

Client:

Cernach Housing Association 79 Airgold Drive, Glasgow, G15 7AJ Jean Thomson Gavin Burt

Quantity Surveyor:

Thomas J Ross Unit 28, Coatbridge Business Centre, 204 Main Street, Coatbridge, ML5 3RB
Tom Gilfillan

Contract Type:

NEC3 Short Contract

Key Features:

  • Site set up/Site clearance
  • Vegetation clearance
  • Install temporary fencing/barriers
  • Remove existing fencing / Tree felling
  • Breakout / remove kerbs and slabs
  • Remove clothes poles
  • Breakout concrete
  • CAT scan and protect existing services
  • Drainage works, including new gullies, silt traps, manholes and pipework
  • Strip topsoil / Excavation / Disposals
  • Geotextile membrane / Backfill
  • Imported fill / Surface treatment
  • Type 1 / Bituminous surfacing / Reinstatement / Concrete
  • Kerbing and edging / Pea gravel
  • Install new binstores
  • Install brick retaining wall, including cope
  • Install new concrete steps
  • New iron railings 1.5m and 1.1m high
  • Install galvanised mid steel handrails
  • 1.5m high galvanised mid steel fencing and metal gates
  • Galvanised mesh panels
  • Timber post and rail fencing
  • Street furniture, including clothes poles and litter bins
  • Weedkiller
  • Soft landscaping, including topsoil, seeding and planting

Dunkenny Rd & Ledmore Drive Backcourt Improvements

Description of Works

Caley Construction Ltd were appointed as Principal Contractor to carry out the Environmental Improvement to the rear gardens of existing Cernach Housing Association properties located at Ledmore Drive and Dunkenny Road in Drumchapel.

The works included installation of New Paving, Tarmac, Clothes Poles, Bin Stores, Repairs to Existing Paths, Fencing and Walls and a degree of Hard and Soft Landscaping to enhance and improve the backcourt area for the residents.

Sub-Contractors

Fencing – Hay & Anderson (Kilwinning) Ltd
Tree Surgery – John Meikle Contractors

20160518 141121
20160518 141224
20160518 141857
IMG 4017
IMG 4080
IMG 4085
IMG 4096
IMG 4113
IMG 4125
Planting
Brush Up
Climber Pits
Dog Fouling
Handrail To Steps
Incomplete
Remove Canes Etc And Train To Mesh
Send On To LE